Electrostatic charge image developing toner, electrostatic charge image developer, and toner cartridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989871
SERIAL NO

15491145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrostatic charge image developing toner includes toner particles including an amorphous resin and a crystalline resin, wherein, when the toner particles are subjected to a measurement to determine an area ratio of the crystalline resin present on a surface of the toner particle before and after being heated at a temperature of 50° C. and a humidity of 50% RH for a week, a relationship between an area ratio a (%) of the crystalline resin present on a surface of the toner particles before being heated and an area ratio b (%) of the crystalline resin present on a surface of the toner particles after being heated satisfies Expression (1): 0.05≤(b−a)/b≤0.50.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJI XEROX CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kadokura, Yasuo Kanagawa, JP 95 308
Matsumoto, Akira Kanagawa, JP 269 2183
Miura, Satoshi Kanagawa, JP 121 948
Nakamura, Yukiaki Kanagawa, JP 46 82
Nakashima, Shinya Kanagawa, JP 34 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00