UBM (under bump metal) electrode structure for radiation detector, radiation detector and production method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10199343
APP PUB NO 20180061792A1
SERIAL NO

15705421

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An UBM electrode structure body for a radiation detector and a radiation detector arranged with the UBM electrode structure body are provided for suppressing peeling and having high electrode adhesion. In addition, a manufacturing method of an UBM electrode structure body for a radiation detector and a manufacturing method of a radiation detector using the UBM electrode structure body are provided in which peeling does not occur during UBM structure formation, a solder bonding process or bonding of a signal line to a Pt layer. The UBM electrode structure body for a radiation detector of the present invention is arranged with a CdTe substrate or CdZnTe substrate and a Pt electrode layer arranged on the CdTe substrate or CdZnTe substrate, adhesion of the Pt electrode layer with respect to the CdTe substrate or the CdZnTe substrate being 0.5 N/cm or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JX NIPPON MINING & METALS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mikami, Makoto Ibaraki, JP 22 42
Murakami, Kouji Ibaraki, JP 24 367
Noda, Akira Ibaraki, JP 66 533

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00