Atomic layer deposition methods and structures thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10854725
APP PUB NO 20180061957A1
SERIAL NO

15790739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and structure for providing a pre-deposition treatment (e.g., of a work-function layer) to accomplish work function tuning. In various embodiments, a gate dielectric layer is formed over a substrate and a work-function metal layer is deposited over the gate dielectric layer. Thereafter, a fluorine-based treatment of the work-function metal layer is performed, where the fluorine-based treatment removes an oxidized layer from a top surface of the work-function metal layer to form a treated work-function metal layer. In some embodiments, after performing the fluorine-based treatment, another metal layer is deposited over the treated work-function metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Da-Yuan Jhubei, TW 128 1021
Lee, Hsin-Yi Hsinchu, TW 110 135
Tsai, Cheng-Yen New Taipei, TW 49 164

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00