Anode material for secondary battery and non-aqueous electrolyte secondary battery using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10862115
APP PUB NO 20180069237A1
SERIAL NO

15573669

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an anode material for a secondary battery which reduces and inhibits swelling of a high-capacity silicon-containing alloy material to realize excellent charge/discharge cycle characteristics. The anode material includes alloy particles containing a transition metal which has electron conductivity, is difficult to react with lithium atoms and is at least one selected from the group of metals that belong to transition metals, and silicon, wherein the alloy particles include amorphous silicon, and silicide microcrystals formed by silicon and the transition metal, and the silicide microcrystals are scattered in amorphous silicon.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Igarashi, Yoshiyuki Tokyo, JP 13 24
Matsubara, Keiko Tokyo, JP 27 602

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 8, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00