Method for transmitting messages in a data bus system, transceiver and electronic control unit for a motor vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10742443
APP PUB NO 20180069723A1
SERIAL NO

15558350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transmitting messages in a data bus system, wherein the messages can be transmitted in the form of data frames by a data bus and a data frame that is to be sent by a bus subscriber is checked for a piece of changeover information, which method is furthermore distinguished in that changeover of the rise time and/or edge shape of edges of bit pulses of the data frame that is to be sent is performed on the basis of the presence of a defined value of the piece of changeover information. In addition, a corresponding transceiver and to an electronic control unit is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CONTINENTAL TEVES AG & CO. OHG; NXP USA INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexandrovich, Kulkov Eugeny Tula, RU 1 3
Beckmann, Tobias Eschborn, DE 6 35
Cornelius, Claas Hannover, DE 2 11
Gach, Robert Seysses, FR 6 23
Janiszewski, Ireneusz Mühltal, DE 3 12
Sergeevich, Ryabchenkov Sergey Moscow, RU 1 3
Turpin, Pierre Toulouse, FR 24 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00