Portable leaf blower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10433497
APP PUB NO 20180070536A1
SERIAL NO

15563855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A portable leaf blower comprises a housing having an air inlet and an air outlet port and defines an air outlet port axis. A handle is attached to the housing. A motor is mounted within the housing, with the motor mount having a rotatable drive shaft. A rotatable impeller is mounted on the drive shaft for rotation therewith, and to draw air into the air inlet and to blow the air out of the air outlet port in generally parallel relation to the air outlet port axis. A blower tube has a tube ingress port and a tube egress port, and defines a tube ingress port axis. The blower tube is connectable in supported relation to one of the housing and the handle, such that the tube ingress port is positioned in spaced relation to the air outlet port, with the air outlet port axis being coincident with the tube ingress port axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANADIAN TIRE CORPORATION LIMITED2180 YONGE STREET TORONTO M4P 2V8

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Bruce Matthew T Toronto, CA 1 2
Wolf, Anthony Toronto, CA 12 286

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00