Haemostatic bracelet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10631875
APP PUB NO 20180070957A1
SERIAL NO

15563699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a haemostatic bracelet (1) comprising: —a clamp comprising two branches (11, 12) and a first strut (13), each branch (11, 12) being connected by one of its ends to the other branch by means of the first strut (13), —a compression element (24) placed, when the bracelet is ready for use, inside the space defined by the branches (11, 12) and the first strut (13) of the clamp or inside a projection of this space, the compression element (24) protruding in the direction of the opening between the ends of the branches (11, 12) of the clamp opposite to the first strut (13), —actuation elements (30, 40) fixed to the branches (11, 12) of the clamp so that the ends of the branches (11, 12) of the clamp opposite to the first strut (13) can be spread by moving the ends of the actuation elements towards each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRESENIUS MEDICAL CARE DEUTSCHLAND GMBH61352 BAD HOMBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dody, Cyril Sain Bel, FR 2 5
Dumont, D'Ayot François Lyons, FR 1 0
Laffay, Philippe Sainte Foy les Lyon, FR 34 370
Volle, Jacques Tassin la Demie Lune, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00