Power tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10307841
APP PUB NO 20180071843A1
SERIAL NO

15554517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool includes: a brushless motor; a rectifier circuit; a smoothing circuit; an inverter; a controller; an operating part; and a switch. The switch is rendered ON in accordance with an operation performed in the operating part by a user to allow power to be supplied to the inverter circuit by the rectifier circuit through the smoothing circuit and rendered OFF in accordance with release of the operation by the user to interrupt the inverter circuit from the rectifier circuit to halt supplying the power to the inverter circuit. The smoothing circuit includes a first capacitor and a second capacitor connected in parallel. The controller is configured to control the switching operations of the inverter circuit to drive the brushless motor in accordance with a signal inputted in accordance with the operation performed in the operating part by the user.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOKI HOLDINGS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Funabashi, Kazuhiko Hitachinaka, JP 95 1414
Koizumi, Toshiaki Hitachinaka, JP 25 270
Yoshinari, Takuya Hitachinaka, JP 18 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00