Composite beam apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10204759
APP PUB NO 20180076001A1
SERIAL NO

15696445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite beam apparatus includes an electron beam column for irradiating an electron beam onto a sample, a focused ion beam column for irradiating a focused ion beam onto the sample to form a cross section, and a neutral particle beam column having an acceleration voltage set lower than that of the focused ion beam column for irradiating a neutral particle beam onto the sample to perform finish processing of the cross section. The electron beam column, the focused ion beam column, and the neutral particle beam column are arranged such that the beams of the columns cross each other at an irradiation point. A controller controls the electron beam column to irradiate and scan the electron beam on the sample during cross section processing by the focused ion beam column and during finish processing by the neutral particle beam column. The composite beam apparatus is capable of suppressing the influence of charge build-up, or electric field or magnetic field leakage from an electron beam column, when subjecting a sample to cross-section processing with a focused ion beam and then performing finishing processing with another beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI HIGH-TECH SCIENCE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asahata, Tatsuya Tokyo, JP 54 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00