tubular mesh burner and methods of use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11435091
APP PUB NO 20180080659A1
SERIAL NO

15270882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tubular burner and methods of use in a furnace having reduced NOx emissions are provided. The tubular burner comprises a structural skeleton and a mesh screen disposed about the structural skeleton. The structural skeleton may be coupled to an air/fuel mixture source. The structural skeleton may comprise a hollow interior and a plurality of perforations to allow the air/fuel mixture to pass from the interior of the structural skeleton to the exterior. The burner systems may further comprise a plurality of holes spaced along and between the burners for cross-lighting of multiple burners using a single igniter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOODMAN MANUFACTURING COMPANY LP5151 SAN FELIPE SUITE 500 HOUSTON TX 77056

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brake, George R Dickson, US 3 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00