Apparatus and method for conversion of solid waste into synthetic oil, gas, and fertilizer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10808190
APP PUB NO 20180086993A1
SERIAL NO

15701899

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing oil, gas, and ash fertilizer from a feedstock includes inputting the feedstock into a reaction chamber having a wall, and combusting the feedstock in the reaction chamber. An electrical current flow is induced between the reaction chamber wall and the feedstock so as to cause arcing in the feedstock within the reaction chamber. Ash reaction byproducts migrate downward through the reaction chamber onto ash support structure, which is substantially electrically isolated from the reaction chamber wall. Gas and liquid reaction byproducts migrate upward through the reaction chamber to an upper chamber by a partial vacuum in the upper chamber, and are evacuated therefrom. The oil and gas are then separated from the evacuated gas/liquid products, providing the oil and the gas products. The oil is refinable, the gas is high in energy content, and the ash fertilizer is high in nitrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RIOMAR ENERGY LLC1701 HIGHWAY A1A SUITE 206 VERO BEACH FL 32963

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rogers, Michael W El Dorado, US 23 656

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00