One-dimensional large-stroke precise positioning platform

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10483877
APP PUB NO 20180097457A1
SERIAL NO

15549248

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A one-dimensional large-stroke precise positioning platform includes a housing, a cross ball guiding rail, piezoelectric ceramic and an elastic member. The cross ball guiding rail includes a mover guiding rail and stator guiding rails. A first and second fixing member is movable in a containing chamber provided in the housing. In the longitudinal direction of the mover guiding rail, one end of the piezoelectric ceramic is abutted against the first fixing member, and the other end against the second fixing member. The mover guiding rail is fixed on the second fixing member, and the elastic member is fixed on the first fixing member. In the width direction of the mover guiding rail, the two sides of the elastic member are abutted against the inner side surfaces of the containing chamber, and the first fixing member is connected with the second fixing member by a flexible member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SOOCHOW UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhong, Bowen Suzhou, CN 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00