Method for manufacturing a mechanical component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10695832
APP PUB NO 20180099331A1
SERIAL NO

15727193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a mechanical component by additive manufacturing which includes at least one layering sequence of depositing a powder material and locally melting and resolidifying the powder material. In each layering sequence, a solid layer of solidified material is formed, wherein the solid layers jointly form a solid body. An annealing sequence subsequent to at least one layering sequence includes, locally heating at least a region of the solid body in effecting a local heat input to the immediately beforehand manufactured solid layer which was formed by the immediately precedent layering sequence, with temperature being is maintained below a melting temperature of the material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC TECHNOLOGY GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Engeli, Roman Zurich, CH 9 72
Etter, Thomas Muhen, CH 32 342
Hoebel, Matthias Windisch, CH 39 696
Pavlov, Mikhail Dietikon, CH 11 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 30, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00