External load management functions for vertical take-off and landing aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10676193
APP PUB NO 20180099748A1
SERIAL NO

15566282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an aspect, a system in an aircraft includes a vehicle management system (VMS) and a load control system (LCS). The LCS includes an LCS processor operable to receive and transmit a plurality of data and load management commands to one or more of: the VMS and a load control interface. The LCS processor is further operable to interact with one or more of: the VMS, one or more LCS sensors, and a load capturing interface of the aircraft to execute the load management commands as a sequence of one or more load management subcommands. The load capturing interface is operable to capture and release an external load relative to the aircraft using a load capture device. The LCS processor is also operable to report a status of execution of the load management commands to the VMS and the load control interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIKORSKY AIRCRAFT CORPORATION6900 MAIN STREET P O BOX 9729 STRATFORD CT 06615-9129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lesperance, Jesse J Harvest, US 10 116
Zygmant, Thomas Southport, US 9 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00