Control equipment for monitoring flows of drilling muds for uninterrupted drilling mud circulation circuits and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10487601
APP PUB NO 20180106118A1
SERIAL NO

15570033

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Control equipment monitors flows of drilling mud in a drilling mud circulation circuit. The equipment includes: at least one first inlet element, in turn having at least one first measuring device; at least one second outlet element, in turn having at least one second measuring device, and a processing and control unit electrically connected to both the first measuring device and the second measuring device. The processing and control unit receives measurement data from the first measuring device and the second measuring device. The equipment includes a third control element having at least one third measuring device. The processing and control unit is electrically connected to the at least one third measuring device; it receives measurement data from the third measuring device, and processes the data thus obtained by a model-based mathematical algorithm. The equipment includes a signaling device, which is electrically connected to the processing and control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DRILLMEC S.P.A.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calderoni, Angelo San Donato Milanese, IT 19 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00