Power supply apparatus and a test system including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10381925
APP PUB NO 20180109184A1
SERIAL NO

15584486

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply apparatus includes first through M-th switching regulators, first through N-th multiplexers, and first through N-th linear regulators, where each of M and N is a natural number greater than or equal to two. The first through M-th switching regulators generate first through M-th reference power signals using an input power signal. The first through N-th multiplexers select one of the first through M-th reference power signals, in response to a power selection signal, to provide first through N-th selection power signals. The first through N-th linear regulators generate first through N-th output power signals using the first through N-th selection power signals. The first through N-th linear regulators are connected to the first through N-th multiplexers, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chun, Sung-Chul Suwon-si, KR 2 16
Kim, Jae-Hong Seoul, KR 192 1537
Kim, Sung-Yeol Yongin-si, KR 25 313
Lee, Seong-Kwan Suwon-si, KR 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00