Coaster and trolley system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10835834
APP PUB NO 20180126287A1
SERIAL NO

15808750

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rail coaster operates as a cross between a roller coaster and a zip line. A rail may be suspended under a frame by flexible cables or solid brackets. The rail may turn, incline, decline, or twist, but need not twist to still provide a “rolling” degree of freedom for a rider. An eddy current brake provides proportional braking as a function of speed. A cam-adjustment-axle (eccentric) carries certain wheels to provide finely divided, discrete, but incrementally small adjustments of idler wheel clearances to accommodate variations in the rail, wheel wear, and onsite adjustment of tolerances for curvature, unevenness, and friction. A “static universal” bracket provides adjustment in four degrees of freedom, three of translation and one of rotation in securing a rail to a supporting frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HIGH VELOCITY DESIGNS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Resnicke, Christopher Ryan Lincoln, US 5 5
Wilson, Jeffrey Dean Newcastle, US 7 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 17, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00