Smart slide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10816267
APP PUB NO 20180128547A1
SERIAL NO

15807159

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A furnace system has a furnace-tube-cap (FTC) and a slider. The FTC has a first-cap-portion coupled to a furnace tube of a furnace, a second-cap-portion with a bearing-assembly-arrangement (BAA), and an inner-tube-cap-channel (ITCC) passing from the first-to-second cap portion with an ITCC sealing arrangement extending outside the ITCC. The slider slides in the BAA to/from inject-and-rinse positions, and has a first-ramp (FR), a first-raised-surface (FRS), an intermediate-lower-surface (ILS), a second-ramp (SR), and a second-raised-surface (SRS). When the slider moves to the inject-or-rinse positions, the BAA forces a slider-part to push against an inner-channel-sealing-arrangement (ICSA) as the BAA goes from the FR-to-FRS, or the SR-to-SRS. When the slider is in the inject-or-rinse position, a first-slider-part seals the ITCC sealing arrangement. When the slider transitions between the inject-and-rinse positions and the BAA rides along the ILS, the BAA allows the slider-part to float above the ICSA arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
O I CORPORATION151 GRAHAM RD COLLEGE STATION TX 77845

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bauman, Noel C College Station, US 6 9
Rawls, Nathan C Somerville, US 7 32
Simon, Richard K College Station, US 4 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00