NTC thermistor to be embedded in a substrate, and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10181369
APP PUB NO 20180130577A1
SERIAL NO

15679332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An NTC thermistor to be embedded in a substrate includes a thermistor body that is a ceramic sintered body and includes two opposed main surfaces, two opposed side surfaces, and two opposed end surfaces, a plurality of internal electrodes provided inside the thermistor body, and two external electrodes provided on outer surfaces of the thermistor body, and electrically connected to the plurality of internal electrodes. Each of the external electrodes includes a first electrode layer covering one of the end surfaces of the thermistor body, a second electrode layer provided on each of the main surfaces of the thermistor body, the second electrode layer including at least one layer, one end of the second electrode layer being in contact with the first electrode layer, and another end thereof extending in a direction of another end surface, and a third electrode layer including at least one layer and covering the first electrode and the second electrode layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Toda, Kei Nagaokakyo, JP 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00