System and method for active cooling of a grate bar for an incinerator of a waste-to-energy plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10309648
APP PUB NO 20180142889A1
SERIAL NO

15358442

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling system for a grate bar of an incinerator of solid materials is provided includes a feed grate having a plurality of grate bars, at least one of the grate bars including a body having a top surface, a bottom surface, a first end and a second end, a first aperture in the body and a second aperture in the body, and an internal passageway defined within the body and fluidly connecting the first aperture to the second aperture, the first aperture arranged to receive a gas therethrough into the body, and the second aperture arranged to provide an egress for the gas out of the body. The cooling system further includes a manifold duct fluidly coupled to the second aperture for receiving the gas from the second aperture. The gas is independent of the primary combustion air of the incinerator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dunnu, Gregory Nuertingen, DE 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00