Low power pressure tube nuclear reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10854341
APP PUB NO 20180144834A1
SERIAL NO

15577611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A low-power nuclear reactor includes a housing and a reflector forming a reactor core. The core includes inner and outer primary tubes therein, arranged together as bayonet tubes and intended for circulating a coolant, and secondary tubes, accommodating elements of a control and protection system. The reactor further includes an intake chamber for coolant of a primary loop, and a discharge chamber for coolant of the primary loop, separated by a partition. The outer primary tubes are secured on the intake chamber's bottom, and the inner primary tubes are secured on the partition. Fuel assemblies are mounted in the inner primary tubes on suspensions, which are mounted on the discharge chamber's upper portion. The secondary tubes are sealed off from the intake and discharge chambers for the coolant of the primary loop, and an inter-tube space of the core is filled with a medium or material transparent to neutrons.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STAR ENERGY SAPLACE DES EAUX-VIVES 6 GENEVA 1207

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lebedev, Larion Aleksandrovich Moscow, RU 1 3
Levchenko, Valeriy Alekseyevich Obninsk, RU 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00