Excavator implement angle determination using a laser distance meter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10358788
APP PUB NO 20180171581A1
SERIAL NO

15386115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An excavator calibration framework comprises an excavator, a laser distance meter (LDM), and a plurality of laser reflectors. The excavator comprises a chassis, linkage assembly (LA), implement, and control architecture. The LA comprises a boom, stick, the implement, and a four-bar linkage including nodes, with a laser reflector at each node. The control architecture comprises a controller programmed to execute an iterative process at n linkage assembly positions to determine a position of an nth calibration node of the plurality of nodes of the four-bar linkage to determine triangular angles and side lengths of an external triangle formed between the nth calibration node and two other nodes having identified positions. The iterative process is repeated n times until triangular angles and side lengths of three external triangles are determined that form an internal triangle. Angles of the internal triangle are determined to generate an implement angle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CATERPILLAR TRIMBLE CONTROL TECHNOLOGIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frei, Samuel Joseph Christchurch, NZ 10 8
Howell, Mark Nicholas Christchurch, NZ 10 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00