Core plate assembly, and a method of performing work on a core plate assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10665352
APP PUB NO 20180182499A1
SERIAL NO

15801736

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A core plate assembly for a boiling water reactor, and a method of performing work thereon are disclosed. The core plate assembly comprises a core plate having through-going apertures, and a beam structure comprising parallel first beams and parallel second beams being perpendicular to the first beams. The beams enclose a plurality of rectangular areas each enclosing four of the through-going apertures. Control rod guide tubes are aligned with a respective one of the through-going apertures. A transition pieces is received in a respective one of the control rod guide tubes, and has four passages for communicating with a respective fuel assembly. Each passage permits a coolant flow into the respective fuel assembly. A flow inlet is provided for the coolant into each passage. At least one of the flow inlets has a cross-sectional shape deviating from a circular shape.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WESTINGHOUSE ELECTRIC SWEDEN AB721 63 VÄSTERÅS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Le, Moigne Yann Västerås, SE 1 0
Perzon, Sven Västerås, SE 1 0
Remahl, Henrik Västerås, SE 2 14
Strömgren, Tobias Västerås, SE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00