Transportation support assembly and transport device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10179701
APP PUB NO 20180194557A1
SERIAL NO

15736246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transportation support assembly and a transport device are provided in embodiments of the disclosure, the transportation support assembly comprising: a supporting plate; a first baffle plate; a second baffle plate; and at least one bundling strap. Each of the first baffle plate and the second baffle plate is hinged with the supporting plate and is provided thereon respectively with at least one through-hole through which the at least one bundling strap passes such that the first baffle plate, the second baffle plate and the bundling strap cooperate with one another to clamp an object to be supported. Thereby, human labor as required for handling and carrying an apparatus is saved, and any risk in handling and carrying of the apparatus is also reduced, by the transportation support assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BOE TECHNOLOGY GROUP CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Lei Beijing, CN 217 877
Hu, Nannan Beijing, CN 19 19
Lin, She Beijing, CN 18 16
Ren, Yan Beijing, CN 101 166
Wang, Zifeng Beijing, CN 120 151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00