Composite polyester material, composite polyester fiber, processes for preparing the same and uses thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10689501
APP PUB NO 20180223072A1
SERIAL NO

15522476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polyester material including a composite having a carbon nanostructure, which comprises carbon element, from 0.5 to 4 wt % of a first non-carbon non-oxygen element substance, and from 0 to 4 wt %, of a second non-carbon non-oxygen element. The first non-carbon non-oxygen element is selected from the group consisting of P, Si, Ca, Al and Na; the second non-carbon non-oxygen element is any one selected from the group consisting of Fe, Ni, Mn, K, Mg, Cr, S or Co, or a combination of at least two selected therefrom. The G peak and D peak of the carbon element in the Raman spectrum has a peak height ratio of 1-20 in the composite having a carbon nanostructure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JINAN SHENGQUAN GROUP SHARE HOLDING CO LTD250204 DIAO TOWN INDUSTRIAL ECONOMIC DEVELOPMENT ZONE ZHANGQIU DISTRICT JINAN CITY SHANDONG PROVINCE JINAN CITY SHANDONG PROVINCE 250204

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Ding Shandong, CN 31 186
Luan, Feng Shandong, CN 6 23
Tang, Yilin Shandong, CN 17 52
Zhang, An Shandong, CN 65 211
Zhang, Jinzhu Shandong, CN 13 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00