Generator and method for converting vibrational energy into electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10461670
APP PUB NO 20180234033A1
SERIAL NO

15912792

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an electromechanical generator for converting mechanical vibrational energy into electrical energy, the electromechanical generator comprising: a mass resiliently connected to a body by a biasing device and adapted to oscillate about an equilibrium point relative to the body with an oscillation amplitude, a transducer configured to convert oscillations of the mass about the equilibrium point relative to the body into electrical energy, and a resilient device disposed between the biasing device and one of the mass and the body, wherein the resilient device is configured to be deformed between the biasing device and the one of the mass and the body only when the oscillation amplitude exceeds a predetermined non-zero threshold amplitude. The resilient device may comprise one of a helical spring, an O-ring and a spring washer, such as a Belleville washer, a curved disc spring, a wave washer, and a split washer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PERPETUUM LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vincent, David Robert Ferndown Dorest, GB 15 105
Wasenczuk, Adam Hants, GB 11 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00