Rocker arm with integrated gear train

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10094249
APP PUB NO 20180266282A1
SERIAL NO

15462091

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switchable rocker arm is provided having first and second arms. The first arm has a first outer end and a first inner end and the second arm has a second outer end a second inner end, with the first and second outer ends contacting a respective one of a cam or a valve. One of the first and second inner ends includes an opening with a ring gear and the other includes at least one support for a planet gear that engages the ring gear. A sun gear is located on a rocker shaft and engages the planet gear. A locking mechanism is switchable from a locked position, in which the sun gear is rotationally fixed to the rocker shaft to transfer a cam lift to the valve via the gear ratio provided in the sun, planet, and ring gear arrangement, and a release position, in which the sun gear is rotatable on the rocker shaft so no cam lift is transferred.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHAEFFLER TECHNOLOGIES AG & CO KGHERZOGENAURACH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagaraj, Sumukha Southfield, US 8 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00