High flow filling equipment and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10712065
APP PUB NO 20180292117A1
SERIAL NO

15945387

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Equipment for transferring fluid into a reservoir or a downstream pipe includes: a piston valve having a body and a rod with a closing member; a chassis defining a housing receiving the piston valve and an upstream passage for fluid, the piston valve movable between a non-inserted and inserted positions, with the piston outside and inside the housing, respectively; and a module defining a cavity for receiving the fluid from the upstream passage and a downstream discharge passage intended to be fluidly connected to the reservoir or downstream pipe, the inlet of the discharge passage defining a valve seat intended to receive the closing member of the piston valve in the deployed position, the module being movable relative to the chassis between an open position, allowing the piston valve to be inserted in the housing, and a closed position, in which the module is fastened to the chassis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIVES FILLING & SEALING44140 LE BIGNON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goasguen, Jacques Le Bignon, FR 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 14, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00