Slide rail assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10617208
APP PUB NO 20180295989A1
SERIAL NO

15784212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A slide rail assembly includes a first rail, a second rail, a third rail, a synchronization member and a fastening member. The third rail is movably mounted between the first and second rails. The synchronization member and the fastening member are movably mounted to the third rail. The synchronization member is configured to engage with the second rail, such that the second and third rails can be synchronously moved relative to the first rail along an opening direction. When the second and third rails are moved to a first predetermined position, the synchronization member is disengaged from the second rail. When the third rail is moved from the first predetermined position to a second predetermined position along the opening direction, the third rail is fastened to the first rail by the fastening member to prevent the third rail from being moved relative to the first rail along a retracted direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KING SLIDE WORKS CO. LTD.; KING SLIDE TECHNOLOGY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ken-Ching Kaohsiung, TW 459 4889
Wang, Chun-Chiang Kaohsiung, TW 456 4963
Yang, Shun-Ho Kaohsiung, TW 276 2646
Yu, Kai-Wen Kaohsiung, TW 23 86

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00