Controllable planar optical focusing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10816704
APP PUB NO 20180299595A1
SERIAL NO

15970658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical device has a first metasurface. A high-contrast pattern of the first metasurface is operable for modifying, over a first phase profile, a phase front of an incident light beam. A second metasurface, is disposed over a plane parallel to the first metasurface with a second high-contrast pattern and operable for shaping, over a second phase profile, the modified phase front of the incident light beam into a converging spherical phase front. A spacer layer, in which the modified phase front of the incident light beam diffracts, is disposed in a controllably changeable separation between the first and second metasurfaces. Controllably changing the separation between the first and the second metasurfaces by a first distance correspondingly changes the position of the focus point of the converging spherical phase front by a second distance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CALIFORNIA INSTITUTE OF TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arbabi, Amir Pasadena, US 52 607
Faraon, Andrei La Canada Flintridge, US 72 1038

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 27, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00