Electrical test splice for coiled tubing supported well pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10443317
APP PUB NO 20180323587A1
SERIAL NO

15585663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A splice connects a lower coiled tubing segment containing a lower power cable segment to an upper coiled tubing segment containing an upper power cable segment. The splice has a lower terminal electrically connecting together upper ends of lower power conductors. An upper terminal electrically connects together lower ends of upper power conductors. An electrical intermediate connector has an upper end that stabs into engagement with the upper electrical terminal and a lower end that stabs into engagement with the lower electrical terminal. A load supporting member surrounds the intermediate connector and joins to upper and lower ends, respectively, of the lower coiled tubing segment and the upper coiled tubing segment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAKER HUGES, A GE COMPANY, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mack, John Catoosa, US 15 102
O'Grady, Kenneth Collinsville, US 9 11
Reynolds, Jackson Claremore, US 4 14
Roy, David R Midland, US 3 61
Strattan, Scott C Broken Arrow, US 20 284

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00