Prepreg, metal-clad laminate and printed wiring board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10472478
APP PUB NO 20180327559A1
SERIAL NO

15755768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A prepreg includes: a woven fabric base; and a semi-cured product of a resin composition, which fills an inside of the woven fabric base and coats a surface of the woven fabric base. The resin composition includes a thermosetting resin, an inorganic filler, a first thermoplastic resin soluble in an organic solvent, and a second thermoplastic resin insoluble in an organic solvent. With respect to 100 parts by mass of the thermosetting resin, a content ratio of the inorganic filler ranges from 50 parts by mass to 150 parts by mass, inclusive, and a total content ratio of the first thermoplastic resin and the second thermoplastic resin ranges from 20 parts by mass to 50 parts by mass, inclusive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD22-6 MOTO-MACHI KADOMA-SHI OSAKA 5710057 ?5710057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Shigetoshi Fukushima, JP 4 3
Hoshino, Yasunori Osaka, JP 19 27
Obata, Shimpei Fukushima, JP 6 3
Takahashi, Ryuji Fukushima, JP 24 101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00