Universal joint or constant velocity joint torque transmission interface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11098764
APP PUB NO 20180335092A1
SERIAL NO

15601191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A universal or constant velocity joint includes a first rotatable shaft member that extends along a longitudinal axis, a bearing member, and a joining member. The first rotatable shaft member has a free end that defines a shaft face spline. The bearing member includes a bearing hub having a first end, a second end, and a longitudinally extending hub bore. The first end has a hub face spline. The joining member fixes the bearing member to the shaft with the hub face spline and shaft face spline engaged in interlocking engagement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STEERING SOLUTIONS IP HOLDING CORPORATION3900 HOLLAND RD SAGINAW MI 48601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Courville, Jeffrey P Frankenmuth, US 16 1
Kleinfeld, Brian J Saginaw, US 16 9
Mondragon-Parra, Eduardo Freeland, US 5 4
Thomas, Steven M Saginaw, US 31 259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00