Grate block for a combustion grate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10760787
APP PUB NO 20180347811A1
SERIAL NO

15735910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grate block for a combustion grate, wherein consecutive grate blocks are arranged in a staircase and are designed to rearrange and convey the combustible material during combustion through pushing motions. The grate block includes a block body, an upper wall forming a supporting surface, and an extension parallel to a longitudinal axis L of the body. The supporting surface drops into a pushing surface formed by a front wall, which has at least one air supply opening for supplying air to the combustion grate, which extends at a right angle or slant to the pushing surface. In the lowest region of the front wall, formed as a foot, which lays on the supporting surface of a grate block, is adjacent in the pushing direction. The front resting edge of the pushing surface is arranged in a plane E extending at a right angle to the longitudinal axis L.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANADEVIA INOVA AGHARDTURMSTRASSE 127 ZÜRICH 8005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brennwald, Werner Neftenbach, CH 10 5
Gablinger, Helen Zurich, CH 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00