Automated method for integrated analysis of back end of the line yield, line resistance/capacitance and process performance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10303829
APP PUB NO 20180349535A1
SERIAL NO

15609559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of electrical device manufacturing that includes measuring a first plurality of dimensions and electrical performance from back end of the line (BEOL) structures; and comparing the first plurality of dimensions with a second plurality of dimensions from a process assumption model to determine dimension variations by machine vision image processing. The method further includes providing a plurality of scenarios for process modifications by applying machine image learning to the dimension variations and electrical variations in the in line electrical measurements from the process assumption model. The method further includes receiving production dimension measurements and electrical measurements at a manufacturing prediction actuator. The at least one of the dimensions or electrical measurements received match one of the plurality of scenarios the manufacturing prediction actuator using the plurality of scenarios for process modifications effectuates a process change.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhosale, Prasad Albany, US 24 40
Rizzolo, Michael Albany, US 226 794
Yang, Chih-Chao Glenmont, US 1031 7515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00