Method of manufacturing a fluid-filled chamber with a tensile element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10807336
APP PUB NO 20180354217A1
SERIAL NO

16107800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a fluid-filled chamber with a tensile element includes manufacturing a tensile element and incorporating the tensile element into a chamber. A first material layer, a second material layer, and a spacing structure having a plurality of support portions and a plurality of gaps may be stacked. The material layers may be located on either side of the spacing structure or on one side of the spacing structure. A strand may be stitched through the gaps to join the material layers and to form the tensile element. The spacing structure may be removed, and the first material layer may be spaced from the second material layer such that segments of the strand extend between the material layers. The tensile element may then be secured to opposite interior surfaces of an outer barrier, and the outer barrier may be pressurized to place the strand in tension.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIKE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meschter, James C Portland, US 115 4535
Taylor, Danielle L Portland, US 36 932

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 20, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00