Propulsion system for an aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10800536
APP PUB NO 20180354635A1
SERIAL NO

15618257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid electric propulsion system includes a gas turbine engine and an electric machine coupled to the gas turbine engine. A method for operating the propulsion system includes determining, by one or more computing devices, a baseline power output for the gas turbine engine; operating, by the one or more computing devices, the gas turbine engine to provide the baseline power output; determining, by the one or more computing devices, a desired power output greater than or less than the baseline power output; and providing, by the one or more computing devices, power to, or extracting, by the one or more computing devices, power from, the gas turbine engine using the electric machine such that an effective power output of the gas turbine engine matches the determined desired power output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergsten, Daniel E Topsfield, US 3 31
Gutz, David Allen Wenham, US 10 98
Wagner, Nicholas Adam Revere, US 3 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 13, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00