Power take-off quick coupler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10156260
APP PUB NO 20180355919A1
SERIAL NO

15617621

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a two-component power take-off (PTO) coupling system for efficient and simplified attachment of implements to a power take-off system of a tractor or other prime mover, having a first component to be attached to the PTO shaft of the tractor or other driver and a second component attached to the implement to be coupled. The coupling system serves to eliminate the difficult task of attaching or detaching a power shaft on a rotary driven farm implement such as a rotary cutter, tiller, generator, pump, etc. to tractor power take off (PTO) or any other driver that has an auxiliary splined power out-put shaft. It is designed for any application in any industry that requires frequent connecting or disconnecting of a rotating shaft to transfer power or torque. The coupling system can accommodate two different series PTO shaft types for example, if the implement has a type two (2) shaft but the owner's tractor is a type one (1) the coupling system can be adapted to accommodate both.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIVENGOOD PHILLIP HCALDWELL TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Livengood, Phillip H Caldwell, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00