Heat exchanger fitted with upstream cover to reduce disturbance to fluid flow in a turbomachine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10837706
APP PUB NO 20180356157A1
SERIAL NO

16003149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger designed to be fixed to a turbomachine wall delimiting a gas flow stream, this exchanger including a body with a front face through which the gas flow passes; an attachment face to the wall; an external face opposite the attachment face and connected to the front face; two lateral faces connected to the front face; a cover surrounding the front face and extending along the prolongation of the external face and the lateral faces, to delimit an intake with an area smaller than the area of the front face, this intake being located upstream from the front face relative to the gas flow stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAFRAN AIRCRAFT ENGINES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrier, Romain Jean-Claude Brunoy, FR 7 3
Kernemp, Irwin Pierre Robert Alfortville, FR 2 0
Langridge, Jonathan David Robert Paris, FR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 17, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00