Process scheme for the production of optimal quality distillate for olefin production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10711208
APP PUB NO 20180362863A1
SERIAL NO

15628086

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and processes for hydrotreating, splitting, and extracting a gasoil feed to produce a saturate-rich feedstock for olefin pyrolysis are provided. A gasoil feed is provided to a hydrotreating section to produce an ultralow sulfur distillate (ULSD) stream. The ULSD stream is provided to a splitter section to produce a light distillate stream and a heavy bottom stream. The light distillate stream is provided to an extraction section to produce an aromatic-rich extract phase and a saturate-rich raffinate phase. The raffinate phase is mixed with the heavy bottom stream to produce an olefin pyrolysis feedstock having a reduced BMCI as compared to the gasoil feed stream and the ULSD stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Ghamdi, Abdulaziz S Ad Dammam, SA 2 0
Beadle, Bruce R Dhahran, SA 14 160
Killingworth, Marcus J Dhahran, SA 3 1
Ramaseshan, Vinod Ras Tanura, SA 29 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00