Installation structure of magnet plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10615649
APP PUB NO 20180366995A1
SERIAL NO

15993680

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an installation structure of a magnet plate for installing a magnet plate for a linear motor to a machine mounting part via a joining member, the magnet plate includes a first face, a second face, a first female threaded part at the second face, and an opening at the first face; the machine mounting part includes a second female threaded part having a winding direction opposite to the first female threaded part on a side opposing the magnet plate; the joining member includes a first male threaded part and a second male threaded part; and the magnet plate is installed to the machine mounting part with the first female threaded part being screwed with the first male threaded part, and with the second female threaded part of the machine mounting part being screwed with the second male threaded part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FANUC CORPORATIONOSHINO-MURA MINAMITSURU-GUN YAMANASHI 401-0597

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishifukumoto, Akira Yamanashi, JP 14 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00