Systems and method for paralleled identical marx generators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10855262
APP PUB NO 20180367125A1
SERIAL NO

16011955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A parallel Marx generator topology capable of producing high power, high current output pulses is provided. The parallel Marx generator topology can include a plurality of Marx generators that operate in parallel to one another to jointly generate an output pulse. The topology can further include a pulse transformer configured to step up the voltage of the pulse created by the plurality of generators and also ensure that each Marx generator of the plurality of Marx generators is outputting substantially the same amount of current. The system can include a common interface that allows for fault detection and control of all the Marx generators using one common control panel. The parallel Marx generator topology can allow for a high voltage, high current pulse to be generated using import/export compliant switches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STANGENES INDUSTRIES INC1052 EAST MEADOW CIRCLE PALO ALTO CA 94303-4271

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cassel, Richard Palo Alto, US 2 2
Hitchcock, Sherry Palo Alto, US 2 17
Holen, Paul Palo Alto, US 1 1
Noel, Kelli Palo Alto, US 1 1
Ross, Randy Palo Alto, US 8 155
Stangenes, Magne Palo Alto, US 1 1
Yeckel, Christopher Palo Alto, US 8 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00