Breast cup for underwear and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10925326
APP PUB NO 20190000154A1
SERIAL NO

16024337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A breast cup for an undergarment, such as a brassiere, includes a cup core that has a first surface and a second surface opposite the first surface. Each of the first and second surfaces is formed with a plurality of grooves. Each groove has an elongated opening, an elongated bottom, and a sidewall on each of two longitudinal sides of the groove. The breast cup also includes a first fabric layer overlying the first surface of the cup core, and a second fabric layer overlying the second surface of the cup core. A top part of the sidewalls of one or more of the plurality of the first grooves is attached to the first fabric layer while at least a portion of the bottom of the one or more of the plurality of the first grooves is not attached to the first fabric layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REGINA MIRACLE INTERNATIONAL (GROUP) LIMITEDUNITS 1001-1010 10TH FLOOR TOWER A REGENT CENTRE 63 WO YI HOP ROAD KWAI CHUNG HONG KONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Zhenqiang Kwai Chung, HK 25 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 23, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00