Air conditioner and blower device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10962238
APP PUB NO 20190003728A1
SERIAL NO

16123424

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, an air conditioner includes a blower device and a heat exchanger. The blower device includes a fan motor, a fan, a fan case and a coupling member. The fan motor includes a first end section and a second end section separate from each other. The fan is coaxially fixed to a rotating shaft. The fan case accommodating the fan and for guiding air discharged from the fan toward the heat exchanger. The coupling member includes a pair of arm sections respectively coupled to the first end section and the second end section, and a bar-like section extending in the axial direction of the rotating shaft across the arm sections and coupled to the fan case. The fan motor and the fan case are integrally coupled to each other through the coupling member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA CARRIER CORPORATIONKAWASAKI-SHI KANAGAWA 212-8585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamada, Yoshinobu Fuji, JP 22 214
Mochizuki, Kiyomi Fuji, JP 1 7
Nakayama, Satoshi Fuji, JP 178 1503
Yoshitake, Nobusato Fuji, JP 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00