Catalyst carrier module for large-capacity catalytic reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10835893
APP PUB NO 20190015824A1
SERIAL NO

16070888

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a catalyst carrier module for a large-capacity catalyst reactor, which can be assembled in a large-capacity structure by laminating a flat plate and a wave plate to be fixed in a can without brazing the flat plate and the wave plate constituting a cell forming body, for use in a catalytic reactor requiring a large-capacity exhaust gas treatment. The catalyst carrier module (or block) includes: a can of a rectangular tube shape having an inlet and an outlet; at least one cell forming body in which a plurality of hollow cells are formed by alternately laminating a wave plate and a flat plate which are coated with a catalyst on a surface thereof and inserted into the can; and a fixing unit installed at the inlet and the outlet of the can to prevent the at least one cell forming body from detaching from the can.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMOGREENTECH CO LTDGIMPO-SI GYEONGGI-DO 10014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Myoung Soo Seoul, KR 57 1780
Kim, Tong Bok Gimpo-si, KR 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 17, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00