Raceway groove machining method, bearing, ball screw device, machine and vehicle production method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10464151
APP PUB NO 20190015916A1
SERIAL NO

16081291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a method for processing a raceway groove configured to circumferentially form a to-be-processed side raceway groove on a surface to be processed of a workpiece, the to-be-processed side raceway groove is configured to be brought into rolling contact with a rolling element, and the surface to be processed is a cylindrical circumferential surface. The method for processing a raceway groove includes: arranging a processing rolling element rotatably between the to-be-processed side raceway groove and a tool side circumferential surface which is opposed to the surface to be processed and which is a cylindrical circumferential surface of a machining tool; rotating the machining tool relatively with respect to the workpiece; and performing a burnishing process on the to-be-processed side raceway groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NSK LTDSHINAGAWA-KU TOKYO 141-8560

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koyama, Hiroshi Fujisawa, JP 165 1316
Yamamoto, Masahito Fujisawa, JP 57 1186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00