Systems and methods for processing heavy oils by oil upgrading followed by steam cracking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10696909
APP PUB NO 20190016970A1
SERIAL NO

16036260

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a heavy oil may be processed by a method that may include upgrading at least a portion of the heavy oil to form an upgraded oil, where the upgrading includes contacting the heavy oil with a hydrodemetalization catalyst, a transition catalyst, a hydrodenitrogenation catalyst, and a hydrocracking catalyst to remove at least a portion of metals, nitrogen, or aromatics content from the heavy oil and form the upgraded oil; and passing the upgraded oil to a steam cracker and steam cracking the upgraded oil to form a steam-cracked effluent; and where the final boiling point of the upgraded oil is less than or equal to 540° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abba, Ibrahim Dhahran, SA 33 129
Bourane, Abdennour Dhahran, SA 111 1331
Ding, Lianhui Dhahran, SA 44 118
Shaik, Kareemuddin Dhahran, SA 23 41
Tamimi, Mazin Dhahran, SA 16 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 30, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00