Methods and apparatus for additively manufactured exoskeleton-based transport structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10751800
APP PUB NO 20190030605A1
SERIAL NO

15659601

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some embodiments of the present disclosure relate to additively manufactured vehicle exterior structures, designed to enclose the vehicle surface and support required operational loads. The vehicle structure includes cavities into which components that require an external interface are inserted. A plurality of components are assembled and integrated into the vehicle structure. The structure may be 3-D printed using multiple printing techniques applied in parallel or in series. In an embodiment, the components and structure are modular, use multiple materials and manufacturing techniques, and enable reparability and replacement of single parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIVERGENT TECHNOLOGIES INC19601 HAMILTON AVENUE LOS ANGELES CA 90502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Czinger, Kevin Robert Santa Monica, US 48 469
Gunner, Jon Paul Palos Verdes Estates, US 28 137
Lakshman, Narender Shankar Torrance, US 31 72
Macey, Stuart Paul Laguna Niguel, US 12 135
Martinez, Antonio Bernerd El Segundo, US 50 194
O'Connell, David Charles Huntington Beach, US 13 212
TenHouten, Broc William Rancho Palos Verdes, US 74 650

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00