Method of synthesizing a material exhibiting desired microstructure characteristics based on chemical dealloying one or more group i or group ii elements from an alloy and method of synthesizing nanocomposites

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11708625
APP PUB NO 20190040497A1
SERIAL NO

16052544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, an alloy is exposed to a hydrophilic solvent at least until at least one Group I or Group II element is substantially removed so as to produce a nanomaterial that substantially includes a metal, semimetal or non-metal material and that exhibits a desired set of microstructure characteristics. The hydrophilic solvent is configured to be reactive with respect to the at least one Group I or Group II element and substantially unreactive with respect to the metal, semimetal or non-metal material. In another embodiment, an active material is infiltrated into pores of a nanoporous metal or metal oxide, after which the infiltrated nanoporous metal or metal oxide material is annealed to produce an active material-based nanocomposite material. A protective coating layer is deposited on at least part of a surface of the active material-based nanocomposite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEORGIA TECH RESEARCH CORPORATION926 DALNEY STREET NW ATLANTA GA 30318

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benson, James Atlanta, US 16 265
Turcheniuk, Kostiantyn Atlanta, US 19 17
Yushin, Gleb Atlanta, US 131 1006

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00