Pulverized-fuel supply unit and method, and integrated gasification combined cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10836567
APP PUB NO 20190055485A1
SERIAL NO

16077589

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulverized-fuel supply unit includes a hopper, first nozzles, second nozzles, a pressurizing-gas supply device, a fluidization-gas supply device, and a pulverized-fuel supply line. The hopper has a hollow to store therein pulverized fuel. The first nozzles are provided to the hopper. The second nozzles are provided to a vertically lower part of the hopper below the plurality of first nozzles. The pressurizing-gas supply device is configured to supply pressurizing gas to increase internal pressure of the hopper. The fluidization-gas supply device is configured to supply fluidization gas to fluidize the pulverized fuel in the hopper. The pulverized-fuel supply line is provided to a vertically lower part of the hopper. The pressurizing-gas supply device supplies pressurizing gas to the first nozzles and the second nozzles. The fluidization-gas supply device supplies fluidization gas to the second nozzles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kasai, Jun Kanagawa, JP 25 76
Nishimura, Koji Kanagawa, JP 77 399
Urakata, Yuichiro Kanagawa, JP 13 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00